Midrand Warehouse Refurbishment, Midrand, Johannesburg

IndustrialMidrand, Johannesburg2023Logistics Operator

Midrand Warehouse Refurbishment

A 24/7 distribution warehouse refurbished on night shift without losing a day of operation.

Programme
6 weeks, night shift
Operational downtime
None
Capacity gain
~40%
Lighting energy saving
~25%

The scope

Industrial refurbishment: structural repairs, epoxy floor coating, high-bay lighting installation and construction of an office mezzanine inside the warehouse envelope.

The challenge

The warehouse could not stop. Distribution ran 24 hours, and the site sat close enough to sensitive equipment that dust and vibration control were contractual, not optional.

What we did

The whole job ran on night shift and weekends using dust-free drilling and cutting. We sectioned the floor so racking was only ever offline in one bay at a time.

The outcome

Completed in six weeks with zero disruption to distribution. Usable storage capacity rose about 40% and the lighting upgrade cut energy cost by roughly 25%.

Got something similar?

Send us the scope, a photograph or a rough idea. We quote properly, and we come back within two working hours.

Call now WhatsApp